Higher education-In 1992 he graduated with honors with a degree in Criminal LEDs "Industrial and civil engineering", qualification "engineer-builder"
In 1997 he graduated from the graduate school and Ph.D. in Saint-Petersburg State University of Architecture and Civil Engineering, specialty "Building constructions, buildings and structures."
01.04.2013 - Associate Professor of "Construction" on a part-time worker, Director of investment projects and capital construction of AES companies group in Kazakhstan, to the present.
01.02.2011. - Repair and perspective development director LLP «AES Ust-Kamenogorsk CHP".
2010-2011,. - Head of the preparation and repair of capital construction-ment of JSC «AES Ust-Kamenogorsk CHP".
Of 2009-2010. - Deputy chief of department of preparation of production of JSC «AES Ust-Kamenogorsk CHP".
Of 2008-2009. - Lead Civil Engineer shop preparation of production of JSC «AES Ust-Kamenogorsk CHP".
Of 2007-2008. - Chief Specialist of the project department of JSC "Vostokshahtostroy".
2003-2007,. - Director \ Dean of Architecture and Construction Institute EKSTU (Dean).
2003. - Deputy. Director of the Architecture and Construction Institute EKSTU.
1992-2007 years - assistant, senior lecturer, associate professor UKSDI-EKSTU.
Period 1990-2007. - Laboratory technician, an engineer, a leading specialist research and production laboratory "BOSKOR" EKSTU.
Planning, preparation and implementation of construction, repair, reconstruction and modernization of the main and auxiliary equipment, buildings and structures of power. Participation in the acceptance of works.
The harmonization of investment agreements and programs, the tariff estimate in state bodies of Kazakhstan, the coordination of various statements and information to local government offices, ministries and departments, participated in the meetings of the CHP.
Implementation of the project of construction of turbine unit UKTETS st.№12 with a capacity of 120 MW (2014-2016gg), working with the engineers of the following areas: construction, heating, electrical, process control and instrumentation Participation in acceptance of work.
Construction and reconstruction of large objects UKTETS: fan cooling tower capacity of 24 000 m3 / hour; Reconstruction of turbine unit # 11 with the modernization of hydraulic and increase installed capacity to 120 MW; Reconstruction of turbine unit st.No.9 with HPS replacement and restoration of steam-turbine kovogo life 220 000 hours. Participation in the acceptance of works.
Structural Engineering from 1995 to 2008. (More than 60 facilities) including design and supervision of construction of the complex pit head buildings Chromtau mining and processing plant at the mine Sunrise c.Khromtau district of Aktobe region; Building Tayota center in Ust-Kamenogorsk; iron nodorozhnoy station Novo-Ust-Kamenogorsk, and others.
Inspection of buildings and structures with the development of recommendations for strengthening and further operation from 1991 to 2007 JSC TMK, "Kazzinc" Ust-Kamenogorsk and Ridder (more than 100 buildings and structures).
Participation in conferences and seminars in Kazakhstan, the Russian Federation, China and Niderladah. At this time, the work of the American company AES
Possession of software for the design and drawing AutoCad, SCAD-OFFICE, LIRA. Also, Microsoft Excel, MS Project, SCP-1S8.
For conscientious work loaded with a diploma of akim of Ust-Kamenogorsk, and a diploma of the Ministry of Industry and New Technologies "Kazakhstan Electronic energetikalyқ Қauymdastyғynyң gramotasy Kurmet"